A new water pump system with 6 high-pressure pumps
The new water tower with 150 m3 water capacity for water consumption of 10 m3/hour
For the desanding of the RUAHA water
New dams, overflow edges and residual water regulations.
Replacement of a Francis turbine to generate 45 kW of electricity
A new intake for water distribution
Pressure line to Francis turbines
Diesel for emergency power supply for the hospital