Impressions

Our team on site


Water pump system

A new water pump system with 6 high-pressure pumps


Watertower

The new water tower with 150 m3 water capacity for water consumption of 10 m3/hour


Sedimentation basin

For the desanding of the RUAHA water


Hydraulic engineering RUAHA

New dams, overflow edges and residual water regulations.


Francis turbine

Replacement of a Francis turbine to generate 45 kW of electricity


Water distribution

A new intake for water distribution


Pressure line

Pressure line to Francis turbines


Diesel revision

Diesel for emergency power supply for the hospital